Features
Fort Lee
September 04, 2024 | NEW JERSEY
RON JEFFERS, New Jersey Editor
Photo by RON JEFFERSFort Lee's three new Seagrave Marauder model 2000-gpm pumpers all have the George Washington Bridge graphics on the sides of the apparatus. The new rigs are assigned to Engines 2, 4 and 5.
This article is a direct street report from our correspondent and has not been edited by the 1st Responder newsroom.
Fort Lee's three new Seagrave Marauder model 2000-gpm pumpers all have the George Washington Bridge graphics on the sides of the apparatus. The new rigs are assigned to Engines 2, 4 and 5.